Caiman | Material Management | Engineering | Reporting | Flight & Crew | Planning | Company | Contacts
  Home > Engineering > Tasks > Tasks Structure
  Engineering
Caiman
Material Management
Engineering
- Tasks
- Types of Tasks
- Tasks Structure
- Configuration Control
- Rotables
- Reliability Analysis
- Warranty Management
- Tagging and Job Card Production
- Technical Publications
Reporting
Flight & Crew
Planning
Company
Contacts

 

 

 

 


Tasks Structure

Tasks are efficiently organised, with Main Tasks, Base Tasks (for instance,  100 Hrs and 25 Hrs Inspections) and Included Tasks working together to provide maximum efficiency with minimum effort. Common task descriptions are recorded separately, so that modifications of repetitive activities only have to be updated once through the entire data base.

Thanks to its efficient task structure Caiman is capable of optimising  Worksop activity with a "best sequence" proposal, saving the operator's money and time.

Removal and maintenance checklists can be produced at any time through a simple terminal transaction.

A Task  main screen is shown below.

 

    ©Copyright 2008 Seleda Data